LAHomework Sign in
South Gate, CA 90280 · San Juan Ave

10352 San Juan Ave

Built 1941 · 844 sq ft
LOT 4,996 SQ FT · 1 STRUCTURE · APN 6223-014-021Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
844 sqft
Lot size
4,996 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6223-014-021

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 304 homes on San Juan Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Restore Garage To Permitted Use And Condition Remove Non-Permitted Bathroom Remove Wall And Ceiling Coverings (Except Fire Wall At North Side) Insall One Window At Rear Garage Wall Remove All Wiring At Garage Install Freestanding 12 X 16 Ft Gazebo At Rear Yard Area (No Electrical)
  • 2023
    permit on fileSolar: Sfres Alt Install New Photovoltaic System (14 Modules, 285.78 Sqft) System Size: 5.11 Kw System Info: Module - (14) Qcells Q.Peak Duo Blk Ml-G9+ 365 (365 Watts) Power Optimizer - (14) Solaredge P505 Inverter - (1) Solaredge Se5000H-Us Monitoring - (1) Solaredge Monitoring 5 Year New Main Panel Upgra
  • 2023
    permit on fileRoof: Added Valuation To Include New Sheathing Sfres Alt Tear-Off And Re-Roof Dwelling (20 Sq) ***This Permit Does Not Guarantee The Condition Of Any Equipment, Appliance, Structures Or Building Elements Nor Does The Inspection Relieve The Owner/Applicant Of Any Code Violations Beyond The Scope Of The Res
  • 2018
    permit on fileGeneral remodel: Inspection Only For New Ps#2018-8541 Scheduled For Monday, 04/30/2018. Inspection Hours Are Between 9-5 Pm - Call Inspector Between 8-9 Am For A Morning Or Afternoon Confirmation At (323)563-9549, Garages Must Be Open For Inspection, Dogs Must Be Tied Please Be Aware That, Although The Inspection Is
  • 2018
    permit on fileElectrical: Correct Vio @ Sfr Per Ps#18-8541 - Dwelling Corrections -Relocate Washer/Dryer To Rear Of Dwelling Unit Under Patio Cover (Requires Planning Dept Approval, Must Be Covered With Horizontal Storage Shed) -Removal Of Masonry Fire Pit At Rear Yard Area -Water Heater Relocation -Removal Of Non-Permitted
  • 2018
    permit on fileGeneral remodel: Correct Vio @ Detached Garage Per Ps#18-8541 - Removal Of Non-Permitted Wall Coverings (East And South Walls Only)
  • 2016
    permit on fileGeneral remodel: Replacement Of Nine (9) Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24" From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Recycle Required-Submit Wrrp Form And Receipts Before Calling For Final. Carbon

Manage this home to schedule a service or to update the timeline.