LAHomework Sign in
Los Angeles, CA 91326 · Chimineas Ave

10926 Chimineas Ave

Built 1957 · 2,123 sq ft
LOT 10,999 SQ FT · 1 STRUCTURE · APN 2715-013-007Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1957
Living area
2,123 sqft
Lot size
10,999 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2715-013-007

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2018
Expected 2038 to 2048From the 2018 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 77 homes on Chimineas Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: [E-Plan] Roof-Mounted Solar Pv System.System Size: 5.16Kw Dc, 4.19Kw Ac(12) 430W Modules(12) 249Va Micro-Inverters(1) 125A Pv Panel*** Applicant Work Description Below: *** Modules: 12 X Qcells Q.Tron Blkm-G2.C1+/Ac 430Inverter: 12 X Qcells Q.Mi.349B-G1Existing System: 20 X Lg: Lg345N1C-V520 X Enpha
  • 2020
    permit on fileSolar: [Eplan] Pc For Roof Top Pv1. System Size Is 6.9 Kwdc (5.8 Kwac) Using (20) Lg345N1C-V5 Modules, (20) Iq7Plus-72-2-Us Microinverters, A 125 Amp Combiner Box And A 125 Amp Generation Panel. Ess Tesla Powerwall (13.5 Kwh). Connected To A New 200 Amp Msp With 225 Amp Busbar. New Msp Shall Be Under Separ
  • 2020
    permit on fileElectrical: 200A Mpu
  • 2018
    permit on fileRoof: Reroof With 27 Sqrs Comp Shingle Roofing. Existing Solid Sheathing. Re · AVINA ROOFING INSTALLERS

Manage this home to schedule a service or to update the timeline.