LAHomework Sign in
Los Angeles, CA 91342 · Clybourn Ave

11337 Clybourn Ave

Built 1948 · 2,790 sq ft
LOT 31,511 SQ FT · 5 STRUCTURES · APN 2530-024-013Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
2,790 sqft
Lot size
31,511 sqft
Structures on lot
5 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
3
Home type
Single-family
Parcel (APN)
2530-024-013

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2023
Expected 2043 to 2053From the 2023 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 19 homes on Clybourn Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on fileRoof: Re-Roof With Class A Or B Roof Covering Material Weighing Less Than 6 Pounds Per Sq. Ft. Over Existing Solid Sheathing 43 Squares. Class A Roof Covering Is Required Within Very High Fire Hazard Severity Zone (Vhfhsz). For Residential Roof Replacement > 50% Of The Total Roof Area, Apply Cool Roof Pro
  • 2023
    permit on fileSolar: Eplan:Plan Check For A New 8.1Kw Dc/ 7.6Kw Ac Solar Photovoltaic System With 22 Modules/ Optimizer, And (1) Inverter.
  • 2023
    permit on fileElectrical: Derate Main Panel From 200A To 175A.
  • 2023
    permit on fileSolar: [Eplan] Changes To An Approved Set. Changes Include Addition Of (27) Modules For A Total Of 49, (27) New Optimizers For A Total Of 49, (1) New Central Inverter For A Total Of 2 And (1) Combiner Box All Interconnected To An Existing 200A Msp. New System Size For Updated System Is 18.3Kwdc / 15.6Kwac*

Manage this home to schedule a service or to update the timeline.