LAHomework Sign in
Granada Hills, CA 91344 · Creekview Rd

12042 Creekview Rd

Built 2004 · 4,231 sq ft
LOT 19,694 SQ FT · 1 STRUCTURE · APN 2601-070-001Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2004
Living area
4,231 sqft
Lot size
19,694 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
5
Home type
Single-family
Parcel (APN)
2601-070-001

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofWorth a look now
Expected 2024 to 2034From build year 2004
20262035
HVACWorth a look now
Usually done by 2024From build year 2004
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 10 homes on Creekview Rd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: (Eplan) Pv1 For Installation Of Roof Mounted Solar Panels. Pv System Includes 25 Modules With 25 Microinverters, And 1 Combiner Box Connected To Existing Main Service Panel. System Size Is 11Kw Dc/9.15Kw Ac. Installation Of 11.000 Kw Dc Solar Pv Micro Inverter System -Roof Mountb. Derate 200A Main B
  • 2026
    permit on fileElectrical: Derate 200A Main Breaker To 175A
  • 2025
    permit on filePlumbing: Install Sub Water Meter

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    HVAC replacementUsually done by 2024
  • Now
    Roof replacementExpected 2024 to 2034