LAHomework Sign in
South Gate, CA 90280 · Utah Ave

12106 Utah Ave

Built 1944 · 990 sq ft
LOT 6,459 SQ FT · 2 STRUCTURES · APN 6243-010-002Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1944
Living area
990 sqft
Lot size
6,459 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
1
Home type
Single-family
Parcel (APN)
6243-010-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2019
Expected 2029 to 2034From the 2019 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 98 homes on Utah Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on fileElectrical: Electrical Panel Upgrade (Part Of 2-Gang Panel, Requires Edison Meter Spot Approval)
  • 2020
    permit on filePlumbing: Gas Line From Dwelling To Detached Garage For Gas Clothes Dryer Next To Existing Laundry Area
  • 2019
    permit on fileGeneral remodel: Sfr-(12) Window Replacements Windows Must Meet Emergency Exiting, See Handout. Less Than 18" From Floor And 24" From Doors Must Be Tempered Glass, Smoke Detectors Are Required In Each Bedroom And Hallways Adjacent To Bedrooms Carbon Monoxide Detectors Required Before Final For Jobs Over $1,000.00 Va
  • 2019
    permit on fileGeneral remodel: (1) Window Replacement At Detached Garage
  • 2019
    permit on fileWater heater: Correct Vio @ Sfr Per Ps#18-8612 - Water Heater Replacement
  • 2018
    permit on fileGeneral remodel: #2018-8612 Inspection Set For Wednesday July 11, 2018 Please Call Between 8-9Am To Verify Time Frame For Inspection 323.563.9549. Provide Access To Garage, Exterior Of Dwelling And Any Accessory Structures On Lot. Report Will Be Ready Within 8-10 Business Days From Inspection Date

Manage this home to schedule a service or to update the timeline.

Coming up
  • 2029
    Water heater replacementExpected 2029 to 2034