LAHomework Sign in
Pasadena, CA 91105 · Malcolm Dr

245 Malcolm Dr

Built 1952 · 1,338 sq ft
LOT 6,609 SQ FT · 2 STRUCTURES · APN 5709-024-012Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
1,338 sqft
Lot size
6,609 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5709-024-012

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 1995
Usually done by 2025From the 1995 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterOn record 2002
Usually done by 2017From the 2002 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 70 homes on Malcolm Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2002
    permit on fileWater heater: Water Heater Change
  • 1999
    permit on filePlumbing: Re-Pipe House W/Copper Pipes
  • 1995
    permit on fileRoof: Re Roof Residence W/Elk Fiberglass Shingle Class A
  • 1992
    permit on fileGeneral remodel: Bu - Resurface Deck Relocate Stairs + Handrails Pe Code 3306 Ubc
  • 1991
    permit on file, unconfirmedElectrical: El - Replace Wiring Switches + Outlets Install Lighting In Garage + Yd

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2017
  • Now
    Roof replacementUsually done by 2025