LAHomework Sign in
Glendale, CA 91214 · El Lado Dr

3933 El Lado Dr

Built 1958 · 2,275 sq ft
LOT 8,311 SQ FT · 1 STRUCTURE · APN 5607-012-006Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1958
Living area
2,275 sqft
Lot size
8,311 sqft
Structures on lot
1
Bedrooms
5
Bathrooms
3
Home type
Single-family
Parcel (APN)
5607-012-006

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 1 to confirm. Open "How we estimate this" on any card.
RoofOn record 2000
Expected 2020 to 2030From the 2000 permit
20262035
HVACOn record 2012
Expected 2027 to 2032From the 2012 permit
20262035
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 26 homes on El Lado Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2025
    permit on filePlumbing: Replacing A Dishwasher
  • 2012
    permit on fileHeating & cooling: One Fau Up To 100,000 Btu And One Connection Of Equipment To A Gas System Replace Furnance And Ducting
  • 2000
    permit on fileRoof: Material: 25 Year Asphalt Shingles Class A - No. Of Squares: 34 - Tear Of Existing (Y/N): Y - Existing No. Of Layers: One - New Sheathing (Y/N): 1/2" Cdx Ply Over Existing Sheating 8D @ 6", 12" - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nail

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2020 to 2030
  • 2027
    HVAC replacementExpected 2027 to 2032