LAHomework Sign in
Glendale, CA 91214 · Boston Ave

4320 Boston Ave

Built 1955 · 1,574 sq ft
LOT 5,790 SQ FT · 1 STRUCTURE · APN 5604-016-039Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1955
Living area
1,574 sqft
Lot size
5,790 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
5604-016-039

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2002
Expected 2022 to 2032From the 2002 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 81 homes on Boston Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: Main Breaker Enclosure Up To 200A (200 Amp Mpu)
  • 2025
    permit on fileSolar: New Pv System: 15.480 Kw Dc, 23.000 Kw Ac, Cec Output: 14.173 Kw Cec-Acn
  • 2010
    permit on fileElectrical: One 200 Amp Service
  • 2002
    permit on fileRoof: Material: Comp Shingle Class A - No. Of Squares: 28 Sq. Ft. - Tear Of Existing (Y/N): Yes - Existing No. Of Layers: One - New Sheathing (Y/N): Yes - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2022 to 2032