LAHomework Sign in
Glendale, CA 91214 · Pennsylvania Ave

4357 Pennsylvania Ave

Built 1948 · 1,097 sq ft
LOT 3,230 SQ FT · 1 STRUCTURE · APN 5606-009-041Lot Structure
1 item worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1948
Living area
1,097 sqft
Lot size
3,230 sqft
Structures on lot
1
Bedrooms
2
Bathrooms
2
Home type
Single-family
Parcel (APN)
5606-009-041

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

1 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 229 homes on Pennsylvania Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2015
    permit on fileSolar: Flat Roof (Y/N): No Battery Back-Up (Y/N): No Roof Mounted (Y/N): Y Photovoltaic (Y/N): Y Number Of Arrays: 1 Number Of Branch Circuits: 1 Size Of Water Storage Tank: Amp Service: 200 Hp Transformer (Hp = Kw & Kva): Kw (Kilowatt): 2.3 Kw
  • 2013
    permit on fileElectrical: One 200 Amp Service,8 Branch Circuits
  • 2012
    permit on fileGeneral remodel: Change 11 Windows
  • 2001
    permit on fileRoof: Material:Hot Mop - No. Of Squares:7 - Tear Of Existing (Y/N):N - Existing No. Of Layers: - New Sheathing (Y/N):N - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Roof replacementExpected 2021 to 2031