LAHomework Sign in
Pasadena, CA 91105 · Cherry Dr

439 Cherry Dr

Built 1928 · 2,967 sq ft
LOT 5,876 SQ FT · 2 STRUCTURES · APN 5709-034-024Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1928
Living area
2,967 sqft
Lot size
5,876 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
5709-034-024

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2010
Expected 2030 to 2040From the 2010 permit
20262035
HVACOn record 2010
Expected 2025 to 2030From the 2010 permit
20262035
Water heaterOn record 2010
Usually done by 2025From the 2010 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 53 homes on Cherry Dr →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2010
    permit on fileWater heater: Install 2 Tankless Water Heaters. Replace Pipes & Fixtures In 2 Showers & 2 Bathroom Sinks. Install Pipe And Fixtures For One Tub. Install 2 New Toilets.
  • 2010
    permit on fileHeating & cooling: Install Hvac System
  • 2010
    permit on fileElectrical: Electrical Fixtures For Legalization Of 2Nd Floor Remodel
  • 2010
    permit on fileGeneral remodel: 2Nd Floor Replacement Of Wall Framing Floor Sheething Insulaiton And Drywall And Repair Existing Loft.
  • 2010
    permit on fileRoof: Re-Roof And Tear Off Wood Shake And Install 30 Yr Comp Class "A" Shingle.
  • 2009
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram
  • 2004
    permit on file, unconfirmedGeneral remodel: Historic Building Diagram

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2025
  • Now
    HVAC replacementExpected 2025 to 2030
  • 2030
    Roof replacementExpected 2030 to 2040