LAHomework Sign in
Temple City, CA 91780 · Doreen Ave

4853 Doreen Ave

Built 1947 · 1,136 sq ft
LOT 11,989 SQ FT · 2 STRUCTURES · APN 8585-024-036Lot Structure
0 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1947
Living area
1,136 sqft
Lot size
11,989 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
8585-024-036

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2025
Expected 2045 to 2055From the 2025 permit
HVACOn record 2025
Expected 2040 to 2045From the 2025 permit
Water heaterOn record 2025
Expected 2035 to 2040From the 2025 permit
20262035

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 78 homes on Doreen Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileElectrical: New Sub-Panel 70 Amp For The Addition
  • 2026
    permit on fileElectrical: Upgrade The Main Panel T0 200 Amp
  • 2025
    permit on fileSolar: Install 2.61Kw Roof Mounted Solar Py System. (6) Modules With (6) Micro-Inverters
  • 2025
    permit on fileSolar: Install 6.09Kw Roof Mounted Solar Pv System. (14) Modules With (14) Micro-Inverters
  • 2025
    permit on fileElectrical: Temporary Power Pole
  • 2025
    permit on fileElectrical: Electrical For A New Detached Garage
  • 2025
    permit on filePlumbing: Plumbing For A New Detached Accessory Dwelling Unit And Connect To Public Sewer
  • 2025
    permit on fileHeating & cooling: Install (4) Mini Split Systems And Ventilation Fans For A New Detached Accessory Dwelling Unit
  • 2025
    permit on fileElectrical: Electrical For A New Detached Accessory Dwelling Unit With 100 Amp Service Panel
  • 2025
    permit on fileWater heater: Bathtubs/Showers, Clothes Washer, Hose Bibb, Lavatories, Sinks, Water Closets, Water Heater For Addition And New Addition
  • 2025
    permit on fileHeating & cooling: Install (8) Mini Split Systems And (6) Ventilation Fans For Remodel And New Addition
  • 2025
    permit on fileElectrical: (172) Outlets, (54) Light Fixtures, Range Hood, Washing Machine, Exhaust Fans And Exhaust Fans For Remodel And New Addition
  • 2025
    permit on fileRoof: Re-Roofing For Existing Main House Portion 1136 Sq.Ft. To Match New Addition
  • 2025
    permit on fileGeneral remodel: Build A New Detached 2-Car Garage 400 Sq.Ft.
  • 2025
    permit on fileRoom addition: Main House Addition Of 1364 Sq.Ft. Of 3 Bedrooms, 3 Bathrooms And Renovation Of Existing House 1136 Sq.Ft. Of Changing Existing Layout From 3 Bedrooms 1 Bathroom Into 2 Bedrooms And 2 Bathrooms
  • 2023
    permit on fileGeneral remodel: Replace Existing Front Covered Porch

Manage this home to schedule a service or to update the timeline.