LAHomework Sign in
Glendale, CA 91214 · Boston Ave

5111 Boston Ave

Built 1963 · 1,877 sq ft
LOT 12,749 SQ FT · 1 STRUCTURE · APN 5601-034-002Lot Structure
3 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1963
Living area
1,877 sqft
Lot size
12,749 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
2
Home type
Single-family
Parcel (APN)
5601-034-002

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

3 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofOn record 2001
Expected 2021 to 2031From the 2001 permit
20262035
HVACOn record 2001
Usually done by 2021From the 2001 permit
Water heaterOn record 2001
Usually done by 2016From the 2001 permit

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 81 homes on Boston Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2017
    permit on fileKitchen: Remodel Kitchen Add Flush Beam Close Up 1 Window And 1 Window
  • 2014
    permit on fileSolar: Flat Roof (Y/N): No Battery Back-Up (Y/N): No Roof Mounted (Y/N): Yes Photovoltaic (Y/N):Yes Number Of Arrays: 24 Number Of Branch Circuits: Size Of Water Storage Tank: Amp Service: Hp Transformer (Hp = Kw & Kva): Kw (Kilowatt): 6/12
  • 2001
    permit on fileElectrical: 1 Motor 1-5 Hp
  • 2001
    permit on fileHeating & cooling: 1 Carrier Furnace 75000 Btu, 1 Carrier Air Conditioning System 4 Ton.
  • 2001
    permit on fileRoof: Material:Class A - No. Of Squares:30 - Tear Of Existing (Y/N):Y - Existing No. Of Layers:1 - New Sheathing (Y/N):Y - Note: All Tear-Offs Require Solid Sheathing. Install Min. 3/8" Structural Wood Panel With 6D Common Nails At 6:12. This May Be Installed Over Existing Spaced Sheathing. -
  • 2001
    permit on fileWater heater: 1 Water Heater, And 1 Water System W/O Fixtures

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2016
  • Now
    HVAC replacementUsually done by 2021
  • Now
    Roof replacementExpected 2021 to 2031