LAHomework Sign in
Temple City, CA 91780 · Pal Mal Ave

5416 Pal Mal Ave

Built 2007 · 2,262 sq ft
LOT 6,373 SQ FT · 1 STRUCTURE · APN 8586-030-016Lot Structure
2 items worth planning for in the next 5 years
Mark what is already done and the clock resets for that system. Claim your home to correct details and keep your timeline.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
2007
Living area
2,262 sqft
Lot size
6,373 sqft
Structures on lot
1
Bedrooms
4
Bathrooms
4
Home type
Single-family
Parcel (APN)
8586-030-016

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

2 worth planning for · 0 to confirm. Open "How we estimate this" on any card.
RoofComing up
Expected 2027 to 2037From build year 2007
20262035
HVACOn record 2023
Expected 2038 to 2043From the 2023 permit
Water heaterWorth a look now
Usually done by 2022From build year 2007

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 81 homes on Pal Mal Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2023
    permit on filePlumbing: Install Showers, Lavatories And Kitchen Sink
  • 2023
    permit on fileHeating & cooling: Ventilation Fan
  • 2023
    permit on fileElectrical: 2 Branch Circuits Lighting, 12 Outlets, Electric Oven, Garbage Disposal, Dishwasher And Range Hood
  • 2023
    permit on fileKitchen: (1) Remodel Kitchen, Change Appliance Location, Remove Nook, Replace Cabinets (2) Remodel 1St: Floor Bathroom Bathtub To Shower. (3) Remodel Master Bathroom Remove Tub, Relocate Lavatorie, Enlarge Shower Build Private Enclosure For Water Closet
  • 2022
    permit on fileSolar: Installation Of A 7.60 Kw Roof Mounted Solar Pv System Consisting Of (19) Modules And (19) Micro-Inverters
  • 2007
    permit on filePlumbing: Connect New Residence To Public Sewer
  • 2007
    permit on filePlumbing: Plumbing For New Residence
  • 2007
    permit on fileHeating & cooling: Install Air Conditioning & Heating System For New Residence
  • 2007
    permit on fileElectrical: Electrical For New Residence
  • 2007
    permit on fileElectrical: Temporary Power Pole

Manage this home to schedule a service or to update the timeline.

Coming up
  • Now
    Water heater replacementUsually done by 2022
  • 2027
    Roof replacementExpected 2027 to 2037