LAHomework Sign in
South Gate, CA 90280 · Harding Ave

6050 Harding Ave

Built 1941 · 837 sq ft
LOT 5,449 SQ FT · 2 STRUCTURES · APN 6243-028-010Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1941
Living area
837 sqft
Lot size
5,449 sqft
Structures on lot
2 main home plus another structure: a garage, guest house or ADU
Bedrooms
2
Bathrooms
1
Home type
Single-family
Parcel (APN)
6243-028-010

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 2 to confirm. Open "How we estimate this" on any card.
RoofOn record 2021
Expected 2041 to 2051From the 2021 permit
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 79 homes on Harding Ave →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2024
    permit on fileElectrical: New Stucco For Dwelling -Insulation Of Exterior Walls -Panel Upgrade - 200 Amp (Requires Southern California Edison - Meter Spot) -Re-Wire Exterior Wall
  • 2024
    permit on fileGeneral remodel: New Stucco For Detached Garage
  • 2021
    permit on fileRoof: Sfr- Tear Off Re-Roof Dwelling 11 Squares New Sheathing Recycle Required, Fill Out Wrrp Form And Return To Building And Safety Along With Receipts Before Final. **Note: You Must Specify To The Recycling That Materials Come From South Gate (Your Receit Must Show That All Materials Come From South Gat
  • 2021
    permit on fileRoof: Sfr Tear Off Re Roof Garage 4 Squares New Sheathing Recycle Required, Fill Out Wrrp Form And Return To Building And Safety Along With Receipts Before Final. **Note: You Must Specify To The Recycling That Materials Come From South Gate (Your Receit Must Show That All Materials Come From South Gate) *

Manage this home to schedule a service or to update the timeline.