LAHomework Sign in
Los Angeles, CA 91342 · Foothill Blvd

9830 Foothill Blvd

Built 1952 · 1,866 sq ft
LOT 21,719 SQ FT · 1 STRUCTURE · APN 2550-013-005Lot Structure
Mark what has been done
Most homes this age have replaced a few systems already. Pick the year for each below and your timeline fills in.
Claiming homes opens soon on LAHomework.

We'll email you a one-time sign-in link.

What's on record

Year built
1952
Living area
1,866 sqft
Lot size
21,719 sqft
Structures on lot
1
Bedrooms
3
Bathrooms
2
Home type
Single-family
Parcel (APN)
2550-013-005

Major systems

No system details on record yet. When you claim your home you can add them in a minute.

See something wrong above? Report an error

Systems and what to plan for

0 worth planning for · 3 to confirm. Open "How we estimate this" on any card.
RoofConfirm the year
Probably replaced alreadyWhen was it done?
HVACConfirm the year
Probably replaced alreadyWhen was it done?
Water heaterConfirm the year
Probably replaced alreadyWhen was it done?

Estimates from public records and typical system lifespans. Not an inspection. Marking something as done resets that system's clock.

Nearby on this street

See all 1,110 homes on Foothill Blvd →

What does your home need?

Pick what you need, add your own, and we pass your list to a local contractor for each trade. They contact you. No cost, no obligation.

Coming up
Coming up
Coming up
Get quotes

Sending your list saves it to this home and starts your record. You can manage it anytime.

Your home's update timeline

  • 2026
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2025
    permit on file, unconfirmedElectrical: New Service Panel
  • 2024
    permit on fileSolar: Installation Of A Roof-Mounted Microinverter/Ac Module Solar Photovoltaic (Pv) System, Not Exceeding 38.4Kw In A 1 Or 2 Family Dwelling.
  • 2023
    permit on fileKitchen: Kitchen/Bathroom (2) Remodel For Residential Buildings (No Structural Changes)."Comply With Department Order Effective Date10/13/2023. Permit Will Expire 30 Days From Issuance Date"
  • 2023
    permit on fileElectrical: New Main Panel
  • 2023
    permit on fileElectrical: Reconnect Existing Service "Comply With Department Order Effective Date10/13/2023. Permit Will Expire 30 Days From Issuance Date".
  • 2021
    permit on fileGeneral remodel: Enclose (E) Covered Patio (12'-7" X 34'-7", 398 Sf) To Living Space; "Comply With Department Order Effective Date 01/14/2021. Permit Will Expire 30 Days From Issuance Date"
  • 2018
    permit on filePool: Add 8'-0" Diameter New Spa To The (E) Pool And Replaster The (E) Pool · OWNER-BUILDER
  • 2016
    permit on file, unconfirmedBathrooms: Non-Structural Interior Remodel To Convert Por. (E) Full Bath & Closet · DUZAC CONSTRUCTION CORP

Manage this home to schedule a service or to update the timeline.